Ashtech Prefab (India) Pvt. Ltd. (APIPL) is one of the emerging solution providers in the PEB industry. Our comprehensive range includes Pre-Engineered Steel Building (PEB), Hi-Rib Roofing, Standing Seam Roofing (Ashtech- Standing Seam Sheets), Wall Cladding, Puff Panels, Flashing and Trims, Polycarbonate Skylights, Turbo Vents, Louvers and others.
Kirby was responsible for the mechanical and electrical scope of works. The electrical systems installed by Kirby included:
The mechanical systems installed by Kirby included:
Installed equipment and plant items included UPS, DB’s, Lighting, Pump Room, DX Splits and BMS Panels.
The total project meterage consisted of 2,200m of cable, 1,400m of containment, 500m of pipework and 80 no. of I/O points.
It was appointed as the main mechanical and electrical contractor on a 60MW hyperscale data centre project in Dublin for a leading cloud computing provider.
This project completed by Kirby Group Engineering consisted of electrical works for 18MW Tier 3 Data Centre as well as full civil & electrical turnkey delivery of the transmission connection – A contestable TSO 110kV indoor Gas Insulated Switchgear (GIS) substation, 2 number 110kV underground grid line circuits, approx. 1km and 2.5km in length, 2 number 110 kV/10kV customer transformers and 10kV customer substation, with total Kirby labour on-site reaching 142.
Ashtech was responsible for the delivery of full MEP services for a new 4MW Tier III data centre facility in West Dublin. The project involved the construction of a single storey data centre with services above and plant at roof level, an ESB substation as well as a three-storey office block.
Ashtech was appointed as the main contractor to complete the turnkey design and build from RIBA Stage 3 involving the CSA and MEP fit-out of an existing suite within a live data centre.