Staff Accommodation in Delhi

Warehouse in Greater Noida, Uttar Pradesh

Location

Delhi

Tonnage

330 MT

Area

13,000 sqft.

Usage

Staff Accommodation

Project Description

Kirby was appointed as the main contractor to complete the turnkey design and build from RIBA Stage 3 involving the CSA and MEP fit-out of an existing suite within a live data centre. The project involved the integration of services within a live facility, modifications to existing owner furnished equipment and the supply and installation of new equipment. Pre-fabrication of pipework and modularisation of the plant room ensured design optimisation, reliability and the efficient delivery of an agreed accelerated program.

Scope of Work

Kirby was responsible for the mechanical and electrical scope of works. The electrical systems installed by Kirby included:

  • LV Distribution
  • UPS
  • General & Emergency
  • Lighting
  • General Service Power
  • Mechanical Plant Service
  • Power
  • Fire Detection & Alarm
  • Access Control, Intruder &
  • CCTV
  • Earthing & Bonding
  • Lightning Protection

The mechanical systems installed by Kirby included:

  • Chilled Water
  • Smoke & Heat Exhaust
  • Ventilation
  • Fire Suppression
  • DWS
  • Leak Detection
  • BMS
  • Server Room Air
  • Conditioning
  • Scada
  • Soils & Wastes
  • Process Chilled Water

Installed equipment and plant items included UPS, DB’s, Lighting, Pump Room, DX Splits and BMS Panels.
The total project meterage consisted of 2,200m of cable, 1,400m of containment, 500m of pipework and 80 no. of I/O points.