Ashtech Prefab (India) Pvt. Ltd. (APIPL) is one of the emerging solution providers in the PEB industry. Our comprehensive range includes Pre-Engineered Steel Building (PEB), Hi-Rib Roofing, Standing Seam Roofing (Ashtech- Standing Seam Sheets), Wall Cladding, Puff Panels, Flashing and Trims, Polycarbonate Skylights, Turbo Vents, Louvers and others.
It was appointed as the main mechanical and electrical contractor on a 60MW hyperscale data centre project in Dublin for a leading cloud computing provider.
This project completed by Kirby Group Engineering consisted of electrical works for 18MW Tier 3 Data Centre as well as full civil & electrical turnkey delivery of the transmission connection – A contestable TSO 110kV indoor Gas Insulated Switchgear (GIS) substation, 2 number 110kV underground grid line circuits, approx. 1km and 2.5km in length, 2 number 110 kV/10kV customer transformers and 10kV customer substation, with total Kirby labour on-site reaching 142.
Ashtech was responsible for the delivery of full MEP services for a new 4MW Tier III data centre facility in West Dublin. The project involved the construction of a single storey data centre with services above and plant at roof level, an ESB substation as well as a three-storey office block.
Ashtech was appointed as the main contractor to complete the turnkey design and build from RIBA Stage 3 involving the CSA and MEP fit-out of an existing suite within a live data centre.
It was appointed as the main mechanical and electrical contractor on a 60MW hyperscale data centre project in Dublin for a leading cloud computing provider.
This project completed by Kirby Group Engineering consisted of electrical works for 18MW Tier 3 Data Centre as well as full civil & electrical turnkey delivery of the transmission connection – A contestable TSO 110kV indoor Gas Insulated Switchgear (GIS) substation, 2 number 110kV underground grid line circuits, approx. 1km and 2.5km in length, 2 number 110 kV/10kV customer transformers and 10kV customer substation, with total Kirby labour on-site reaching 142.
Ashtech was responsible for the delivery of full MEP services for a new 4MW Tier III data centre facility in West Dublin. The project involved the construction of a single storey data centre with services above and plant at roof level, an ESB substation as well as a three-storey office block.
Ashtech was appointed as the main contractor to complete the turnkey design and build from RIBA Stage 3 involving the CSA and MEP fit-out of an existing suite within a live data centre.